User Tools

Site Tools


updates:schedule-it-is-possible-to-manually-connect-and-disconnect-sectors-for-ftl-purposes

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
updates:schedule-it-is-possible-to-manually-connect-and-disconnect-sectors-for-ftl-purposes [2017/02/09 12:00]
rafal [Split Duty and Possible rest]
updates:schedule-it-is-possible-to-manually-connect-and-disconnect-sectors-for-ftl-purposes [2017/02/10 08:31] (current)
rafal
Line 1: Line 1:
 ====== New functionality in FDP ====== ====== New functionality in FDP ======
  
-It is possible now to connect and disconnect the sectors within FDP. This functionality is located in FTL Calculations section in tab CREW. +[{{ :leon:schedule:Disconnect.png?200|New functionality within FTL Calculations}}] 
-In this section, you can see {{:leon:icons:splitting fdp.png?nolink&25|}} icon. When you click on this icon following options will appear, depending on the location of the icon:+It is possible now to connect and disconnect FDP sectors 
 + 
 +This functionality is located in FTL Calculations section in tab CREW. 
 +Here, you can see {{:leon:icons:splitting fdp.png?nolink&25|}} icon. When you click on this icon following options will appear, depending on the location of the icon:
  
   * **Join previous** - previous FDP is connected to the current one regardless of the break between the sectors.   * **Join previous** - previous FDP is connected to the current one regardless of the break between the sectors.
-  * **Join Next** - next FDP is connected to the current one regardless of the break between the sectors.+  * **Join next** - next FDP is connected to the current one regardless of the break between the sectors.
   * **Disconnect** - this option applies only when there is **Break** scheduled or option for **Possible rest**    * **Disconnect** - this option applies only when there is **Break** scheduled or option for **Possible rest** 
   * **Apply default** - reverses changes to initial situation. You have to click on the same {{:leon:icons:splitting fdp.png?nolink&25|}} icon.   * **Apply default** - reverses changes to initial situation. You have to click on the same {{:leon:icons:splitting fdp.png?nolink&25|}} icon.
  
-===== Split Duty and Possible rest ===== +In order to divide **Split Duty** or **Possible rest** into 2 separate duties you need to use 'Disconnect' function. This function is only available if the difference between STA of the sector before break and STD of the sector after the break is 06:01h or more. If JL is entered, Leon calculates from BLON of the prior sector to BLOFF of the following sector after the break. 
- +
-In order to divide Split Duty or Possible rest into 2 separate duties you need to use 'Disconnect' function. This function is only available if the difference between STA of the sector before break and STD of the sector after the break is 06:01h or more. If JL is entered, Leon calculates from BLON of the prior sector to BLOFF of the following sector after the break. +
  
-<box>**Changes made using this function are automatically saved in the database. This will reflect in FTL sheet report as well as in TABLE section upon refreshing the view.**</box> 
  
-===== Example ======+<box>**Changes made using this function are automatically saved in the database. This will reflect in FTL sheet report as well as in TABLE section upon refreshing the view or clicking SEARCH in left-hand filter.**</box>
  
updates/schedule-it-is-possible-to-manually-connect-and-disconnect-sectors-for-ftl-purposes.1486641646.txt.gz · Last modified: 2017/02/09 12:00 by rafal