This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
leon:report-ftl-sheet [2020/03/24 12:24] rafal [FTL Sheet] |
leon:report-ftl-sheet [2020/12/03 16:10] rafal [FTL Sheet] |
||
---|---|---|---|
Line 17: | Line 17: | ||
It is possible to view block hours per sector. Mark **Show block times** checkbox in the filter and the column will appear in the report. The data will be displayed in the following format: hh:mm - hh:mm. | It is possible to view block hours per sector. Mark **Show block times** checkbox in the filter and the column will appear in the report. The data will be displayed in the following format: hh:mm - hh:mm. | ||
- | Another | + | Another |
Values such as 'Rest before duty - Min' or 'FDP - Max' are explained when you hover the mouse over the value (see below). | Values such as 'Rest before duty - Min' or 'FDP - Max' are explained when you hover the mouse over the value (see below). | ||
Line 23: | Line 23: | ||
{{: | {{: | ||
- | The same can be done to check cumulative 'Duty time' or 'Block time'. Here Leon shows sometimes 2 different values, depending on whether the calculation is made per 7 calendar days or 168 hours. | + | The same can be done to check cumulative 'Duty time' or 'Block time'. |
- | {{: | + | {{: |
Hover the mouse over **Duty time** column value to find out what part of the duty time has been included into Cumulative Duty calculation (i.e. some Standby duty types have 50% or 25% of STB duty lenght included). | Hover the mouse over **Duty time** column value to find out what part of the duty time has been included into Cumulative Duty calculation (i.e. some Standby duty types have 50% or 25% of STB duty lenght included). |