leon:timeline [2019/11/10 09:23] bartek [Introduction] |
leon:timeline [2020/07/09 09:38] bartek [Introduction] |
||
---|---|---|---|
Line 26: | Line 26: | ||
If there is **airport discontinuity** between airport A and B - a red line will highlight ADEP without continuity with ADES of the last flight. | If there is **airport discontinuity** between airport A and B - a red line will highlight ADEP without continuity with ADES of the last flight. | ||
- | If any crew member has any FTL violation, a tag {{: | + | Leon will show a **red flag** on the right-hand side of the flight-belt if there is **FTL Violation**, **Endorsements expired/ |
+ | |||
+ | {{:leon:schedule-timeline:red flag.png?nolink|}} | ||
Right click of the mouse on the flight or an option strip will open a window with access to **flight documents** as well as **Show crew**, **Show schedule**, and **Notify Crew** functions. This works in exactly the same way as in Calendar and Table sections. CTRL + right click of the mouse on chosen sectors will allow you to print document for these sectors. | Right click of the mouse on the flight or an option strip will open a window with access to **flight documents** as well as **Show crew**, **Show schedule**, and **Notify Crew** functions. This works in exactly the same way as in Calendar and Table sections. CTRL + right click of the mouse on chosen sectors will allow you to print document for these sectors. | ||
Line 85: | Line 87: | ||
We have created a possibility of adding extra lines in the Timeline view which will allow you to mark the events (timeframes) that have to be done before or after the flight. The lines are set to follow the green ' | We have created a possibility of adding extra lines in the Timeline view which will allow you to mark the events (timeframes) that have to be done before or after the flight. The lines are set to follow the green ' | ||
- | First step in this process is to create a line and name it. You need to go to ' | + | The first step in this process is to create a line and name it. You need to go to ' |
{{: | {{: | ||
Line 92: | Line 94: | ||
------- | ------- | ||
+ | ===== Adding Day Notes ===== | ||
+ | |||
+ | |||
+ | It is possible to add **Day Notes** in a section OPS Timeline. It works in a similar way to the one in a section OPS Calendar. | ||
+ | |||
+ | Right-clicking on a given day in a Timeline view will generate a pop-up window where a Day Note can be selected. | ||
+ | |||
+ | |||
+ | {{: | ||
+ | |||
+ | |||
+ | Once the Day Note is added it will appear as a **yellow vertical line**. Hovering over the line will trigger a tooltip with the note text. The added Day Note will also show in OPS Calendar panel. | ||
+ | |||
+ | {{: | ||
+ | |||
+ | ------------------------ | ||
+ | |||
===== Rotation ===== | ===== Rotation ===== | ||