User Tools

Site Tools


updates:it-is-possible-to-choose-the-elements-that-change-handling-request-status

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
updates:it-is-possible-to-choose-the-elements-that-change-handling-request-status [2015/07/15 12:57]
rafal
updates:it-is-possible-to-choose-the-elements-that-change-handling-request-status [2015/07/20 13:24]
ania
Line 1: Line 1:
-[{{ :manual:flight-preparation-checklist:HR changes.png?nolink&300|Handling Request status changes checklist}}]+==== It is possible to choose the elements of the flight that affect Handling Request status ====
  
  
-**It is possible to choose the elements of the flight that affect Handling Request the status.** 
  
-In order to do it you have to go to Admin > Operator settings > Handling Requests tab where you will find HR status changes checklist. Checklist consist of list of items as shown in the screenshot, which when ticked will affect the status and change it to {{:manual:icons:znak zapytania.png?55|}} and vice-versa (unticked - changes made to a flight will not change the status). "Time change treshold" allows to set a buffer where when the schedule is changed by fewer minutes than indicated in this option, the HR status will not change.+ 
 +[{{ :manual:flight-preparation-checklist:HR changes.png?nolink&300|Handling Request status changes checklist}}] 
 + 
 +In order to do it you have to go to Admin > Operator settings > Handling Requests tab where you will find HR status changes checklist. The checklist consists of list of items as shown in the screenshot, which when ticked will affect the status and change it to {{:manual:icons:znak zapytania.png?55|}} and vice-versa (unticked - changes made to a flight will not change the status). "Time change treshold" allows to set a time buffer. If the schedule is changed by fewer minutes than indicated in this option, the HR status will not change.
  
 All the elements of the checklist are ticked by default. **Schedule** checkbox is ticked and cannot be modified. All the elements of the checklist are ticked by default. **Schedule** checkbox is ticked and cannot be modified.
updates/it-is-possible-to-choose-the-elements-that-change-handling-request-status.txt · Last modified: 2016/08/30 13:06 (external edit)